Floor screed for self-levelling or traditional sand/cement — volume, weight and 25kg bags.
Multiply floor area by screed depth to get volume. Sand/cement screed weighs about 2.1 tonnes per cubic metre, so you can convert straight to 25kg bags. Traditional sand/cement screed is laid 50–75mm deep; self-levelling compounds are thinner.
25 m² × 0.05 m = 1.25 m³ of screed. A sand and cement screed weighs around 1,900 kg per cubic metre, so that is roughly 2.4 tonnes of material — about 96 × 25 kg bags, or (far cheaper) 2.5 tonnes of sharp sand delivered in bulk plus 12–14 bags of cement at a 1:4 mix.
A bonded screed is laid directly onto a prepared concrete slab with a bonding slurry — 40–50 mm is typical. An unbonded screed sits on a membrane and needs 50 mm minimum. A floating screed goes over insulation and needs 65–75 mm with reinforcing mesh. If you are only levelling a few millimetres before vinyl or tile, you want a self-levelling compound, not a screed — compounds are not designed to build up 50 mm.
Traditional screed dries at roughly 1 mm per day for the first 50 mm, then slower. A 50 mm screed wants about seven weeks before wood flooring goes down, and it must be moisture-tested first. Force-dried screeds crack. Keep the room ventilated but out of direct sun and draughts for the first few days.
Work to level pins or tripods, compact the mix properly, and finish with a steel float for a smooth surface that takes adhesive. Fit edge insulation strips around the perimeter so the screed can move without cracking. Never mix too dry — a crumbly mix will not compact and you will be patching hollows within a month.
Laying the finish before the screed has dried. Skipping the primer on a bonded screed, so it debonds and sounds hollow. No expansion strips at the walls. And walking on it the same day — foot traffic after 24–48 hours is fine, but heavy loads are not.
A traditional sand/cement screed is usually 50–75mm. Bonded screed can be thinner (25–40mm); floating screed over insulation is typically 65–75mm.
At 50mm depth you need about 2.6 bags per square metre. Use the calculator for your exact depth and area.
Sand/cement is cheaper for deep build-ups; self-levelling is faster and thinner for smoothing over an existing slab.